Baseline Package 210: Internal Product Development


Purpose
  • nThe business process encompasses all steps necessary to setup and process a project to develop a new product.
  • nFurthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing and period-end closing.
Benefits
  • nProject structuring
  • nSimplified preliminary costing for complex projects
  • nRevision levels ensure data consistency
n
Key process flows covered
  • nDocument Management (Easy Document Management)
  • nAssign a document (KPR) to the material masters of the finished product
  • nProject Management
  • nCreate a project based on a template
  • nProduct Data Management with ECM
  • nCreate a change number for the design project
  • nDisplay the BOM of the new product
  • nRedisplay the BOM (effects of change number)
  • nBOM status management
  • nAssign revision level to the material master of the new product
  • nProduct Cost Controlling
  • nMaterial cost estimate for the new product before and after BOM changes (effects of change on price is shown)
  • nMaterial calculation
  • nProject Closing
  • nRecord development (engineering) activities

 